Projects
Projects
Under Study
We are currently studying the following projects
Almergeb Factory
1- Identifying and replacing furnace operating controls
2- Installation of a new main chimney for the furnace.
3- Planning, developing, and implementing the furnace entrance project.
4- Submersible dishes and tubes are being replaced.
5- Replacement of the furnace section.
6- A study is being conducted by the Industrial Research Center to increase the factory's production capacity to 865,000 tons annually.
Souk Elkhamis Complex
1- Replacement and development of furnace parts and accessories.
2- Modernization and replacement of the control, monitoring, and operation systems for furnaces and raw mills.
3- Maintenance and development of elevators.
4- Complete and replace the clinker coolers.
5- Gas supply project.
6- Changing the main dust filters for the two production lines.
7- Developing and replacing Mobilization steps (1, 2).
8- Equipment purchase for quarries.
9- Creating paved paths for new quarries.
10- Studying and modifying the MMD stone crusher.
Lebda Cement Factory
1- Clinker cooler development project.
2- Project and replacement of the alkali side filter.
3- Power factor improvement project.
4- Gravel refinery project.
5- A project to replace and develop the furnace and raw materials mill units and their accessories.
6- A project to maintain the concrete cracks in the crusher basin.
7- The project of developing mechanical filters.
8- A project to replace the automatic control systems for the oven.
9- A project to replace the packing machines (1-4).
10- The project of supplying and installing weighbridges with a tonnage of 150 tons.
11- The project of dismantling and installing gas passages from the raw materials mill.
12- Electric elevators project.
13- A project to purchase, maintain and develop burglary alarms, visual monitoring for protection, production lines, cable corridors, fire extinguishing, entry and exit system, main gates, fences, guard supplies, and others.
14- The ceilings of the warehouses project.
15- Project, supply and installation of alarms and self-extinguishing for warehouses and stations.
16- A project to study the expansion of the Lebda Cement Plant, with a production capacity of (2.4) million tons annually.
Zliten Cement Factory
1 - P.L.C control study project and preparation of technical specifications brochure for the first production line and crushers unit.
2 - A project to replace the oil circuit breakers.
3- A project to replace the packaging unit of F.L.S.
4 - A project to replace the speed motors for the coolant mats, production line No. 1.
5- A project to replace pneumatic winches with bucket winches.
6- A project to replace the gas analyzer for the furnace cooler.
Paper Bags Factory
1- Putting in a fire extinguishing system.
2- Installation of a fire alarm system.