We are currently studying the following projects

Almergeb Factory

1- Identifying and replacing furnace operating controls

2- Installation of a new main chimney for the furnace.

3- Planning, developing, and implementing the furnace entrance project.

4- Submersible dishes and tubes are being replaced.

5- Replacement of the furnace section.

6- A study is being conducted by the Industrial Research Center to increase the factory's production capacity to 865,000 tons annually.

Souk Elkhamis Complex

1- Replacement and development of furnace parts and accessories.

2- Modernization and replacement of the control, monitoring, and operation systems for furnaces and raw mills.

3- Maintenance and development of elevators.

4- Complete and replace the clinker coolers.

5- Gas supply project.

6- Changing the main dust filters for the two production lines.

7- Developing and replacing Mobilization steps (1, 2).

8- Equipment purchase for quarries.

9- Creating paved paths for new quarries.

10- Studying and modifying the MMD stone crusher.

Lebda Cement Factory

1- Clinker cooler development project.

2- Project and replacement of the alkali side filter.

3- Power factor improvement project.

4- Gravel refinery project.

5- A project to replace and develop the furnace and raw materials mill units and their accessories.

6- A project to maintain the concrete cracks in the crusher basin.

7- The project of developing mechanical filters.

8- A project to replace the automatic control systems for the oven.

9- A project to replace the packing machines (1-4).

10- The project of supplying and installing weighbridges with a tonnage of 150 tons.

11- The project of dismantling and installing gas passages from the raw materials mill.

12- Electric elevators project.

13- A project to purchase, maintain and develop burglary alarms, visual monitoring for protection, production lines, cable corridors, fire extinguishing, entry and exit system, main gates, fences, guard supplies, and others.

14- The ceilings of the warehouses project.

15- Project, supply and installation of alarms and self-extinguishing for warehouses and stations.

16- A project to study the expansion of the Lebda Cement Plant, with a production capacity of (2.4) million tons annually.

Zliten Cement Factory

1 - P.L.C control study project and preparation of technical specifications brochure for the first production line and crushers unit.

2 - A project to replace the oil circuit breakers.

3- A project to replace the packaging unit of F.L.S.

4 - A project to replace the speed motors for the coolant mats, production line No. 1.

5- A project to replace pneumatic winches with bucket winches.

6- A project to replace the gas analyzer for the furnace cooler.

Paper Bags Factory

1- Putting in a fire extinguishing system.

2- Installation of a fire alarm system.