Al-Margeb Factory

1. Carrying out maintenance work for the concrete foundations of the furnace and raw mill.

2. Replacement of gas standards for the furnace and raw materials mill.

3. There is a complete study at the Industrial Research Center to develop the factory from a production capacity of 330,000 tons of cement annually to a production capacity of 865,000 tons of cement annually.

Souk Al-Khamis Complex

1. Replacement and development of of Kiln Schell Sections and their accessories.

2. Modernizing and replacing the control, monitoring and operation system for kiln and raw mills.

3. Complete and change the clinker cooler for Line No. 2.

4. Providing the complex with gas.

5. Change the main dust filters of the two production lines.

6. Replacing and developing the packing lines (3, 4).

7. Replacement of main Filter for Lime Plant.

8. Opening a paved path for new quarries.

9. MMD stone crusher study and modification project.

10. Maintenance of concrete columns for the filling unit buildings - water station - clinker hall.

Lebda Cement Factory

1. Power factor improvement project.

2. Replacement and development of the Kiln and Raw mill units, the raw materials mill, and their accessories.

3. Concrete crack maintenance project in the crusher basin.

4. Mechanical refinery development project.

5. Factory control systems replacement project.

6. Replacing the two Packing lines (1-4).

7. Supply and installation of a ground scale weighing 160 tons.

8. Maintenance of the kiln support rollers.

9. Replacing and developing the firefighting system.

10.Study of the expansion of the Lebdah Cement Factory with a production capacity of 2.4 million tons annually.

Zliten Cement Factory

1- Replacementof Control system For Line (1) and Crushers.

2- Oil circuit breakers replacement project.

3- Replacing the bag Packing Plant.

All Factories

1- Supply and installation of a T-Scanner for the kilns in the souk Al-khamis and the Zliten Cement plant.

2- Replacing of gravel filter Lebda and Zliten plants.

3- Installation for clinker kiln weighing system.

4- Electric elevator maintenance and development project.

5- Supply and installation of a fire early warning system.

Head Office building

1- Fire alarm system maintenance project.

2- Using solar energy for lighting.

3- Maintenance of elevator No. (2).

4- Firefighting system and water supply network project.

5- Head office building maintenance project.