Almergeb Cement Plant

Located on the coastal road in Almergeb area, west of Al-Khums and approximately 117 km east of Tripoli.
Total area

40 Hectares

Product Type

Ordinary Portland Cement

Production Lines

Two Lines

First Line

The implementing company

German company "Polysius"

Designed Capacity

100,000 ton/year

Production start

1968

The plant, however, was ultimately decommissioned due to low productivity, outdated equipment, and low economic viability.

Second Line

The implementing company

German company "Polysius"

Designed Capacity

300,000 ton/year

Implementation Start

1971

Production start

1974

As a result of technical problems in 1982, production was completely halted. Raw materials hall, electric refinery, sampling station, and radiological analyzer were all overhauled in 1993, allowing the line to restart. With the restart, imported bauxite was replaced with locally sourced clay, bringing all raw materials within reach of the plant.

Number of Workers

National

Worker
240

Foreign

Worker
3